NEWS: Highways England Delays Consultation Nov 4, 2019

HE site and delay.PNG

Anger as general election delays public consultation further.

Highways England have announced that the first public consultation to happen on the Oxford to Cambridge Expressway has been delayed further as a result of the pre- general election period.

This consultation originally due in Autumn 2019 was for consultation on route options within Corridor B1/B3. We believe there will be 6 routes announced for consultation.. but when this will happen is even less clear now.

However, the general election is an opportunity to to ask all your local candidates what they and their party’s position is on the expressway and over inflated housing targets. Will they support our campaign? Or do they support environmental destruction?

Join our campaign today.


We urgently need your help.

Your donations are needed now, to help us run the campaign and pay for political consultants and other professional experts to bring this campaign to the attention of Westminster as well as local politicians.

No Expressway Group believes there is no need for an Oxford-Cambridge Expressway, nor the over-inflated housing targets associated with it, and we will actively campaign against it and support other organisations with the same objectives. 

Our environment is a national asset which is critical for everyone’s health and well-being. We must not let it be destroyed.

Your donations help us to spread information about the Expressway, run and build support for the campaign:

  • £10 could pay for one roadside Correx poster

  • £15 could pay for one roadside poster on a wooden stake

  • £20 could pay for one A1 printed colour poster for our pagoda display

  • £35 could pay for 250 A5 printed leaflets for the campaign

  • £70 could pay for one pole and two panels for our travelling pagoda display

  • £150 could pay for one feather flag for our travelling pagoda

  • £180 could pay to run this website for one year

  • £300 could pay for a 3 minutes of an Expressway Story

  • £500 could pay for a 5 minutes of an Expressway Story

  • A greater or other amount could contribute to the cost of professional support for our campaign in general and in preparation for Planning Inspectorate hearings

Please note:

The No Expressway Group has a group bank account to which the Chair, Secretary and Treasurer are signatories. The group will publish accounts on noexpressway.org each year which will be audited by an accountant from outside the NEG group.

If any funds are left at the end of the campaign, these will be donated equally between RSPB and BBOWT.